Deploying vRA 8.6.1 using the Easy Installer

In this guide i will go over the deployment of vRA 8.6.1 using the Easy Installer. The reason i like the Easy Installer is because it deploys everything that i need. vIDM, Lifecycle Manager as well as vRA.

To get started we need to download the installer from here.

Once downloaded mount the iso as a drive using your favorite tool or extract it as a archive using something like 7-zip

Once mounted go to the CDROM in the mac directory if on mac or win32 if you are on windows. In here run the installer file

We will be presented with the following window:

The migration option allows us to migrate from from vRSLCM 2.1 to 8.x, it can migrate Datacenter and vCenters, all existing environments, DNS, SNMP, NTP, My VMware, proxy details, migration of vIDM installation as well as Blackstone Content endpoints. For the purpose of this guide we will process with the Install option

Once we click Install we will be presented with an Introduction of what components will be included part on the installation. In my case i can see vRealize Automation 8.6.1, Lifecycle Manager 8.6, Identity Manager 3.3.5.

Click Next, Review, accept the agreement and click next

Provide the vCenter details and click next. In my case i used the administrator account. A detailed list of permissions needed for deployment can be found here

Sections 4, 5, 6 and 7 are straight forward so i will skip them

In section 8 select a password that will be used across all products for the local usernames. ex for LCM root and local admin, vIDM admin, sshuser, root etc

Select a VM name for the Lifecycle Manager appliance and its ip credentials. If you are expecting a large repository in lifecycle manager we can add additional disk under the Increase Disk Size in GB section.

The FIPS Mode compliance option enforces FIPS compliance, however keep in mind that with the FIPS mode enabled there are limitation on what the product can do. This can be disabled later and re enabled as needed.

Complete the fields and click next

The next portion is vIDM. In case there is an existing vIDM appliance in the environment we can also import and existing vIDM appliance. In my case i will deploy a new one.

One important option under vIDM is the Sync Group Members to the Directory When Adding Group. When enabled, members of the groups are synced when groups are added from Active Directory. When this is disabled, group names are synced to the directory, but members of the group are not synced until the group is entitled to an application or the group name is added to an access policy. Note: Post deployment this value cannot be changed from vRealize Suite Lifecycle Manager. To update this field post deployment, navigate to VMware Identity Manager

My configuration page looks like this:

The next section is the vRA Configuration. In here we have a couple of options. We can perform a standard 1 node deployment or a cluster deployment which includes 3 appliances. The FIPS Compliance mode enables FIPS compliance. Unlike LCM this mode cannot be disabled after the deployment. This disables a number of options in vRA from an LCM perspective. Please make sure that its only enabled if required.

The advanced configuration at the bottom of the page includes the option to change the internal Kubernetes cluster and Service ip range. This is useful if the default range is already in use on the internal network. We want to make sure we pick an ip range thats not used somewhere else in order to avoid routing issues. Once complete click next

The next page gives us a summary of our deployment and we can click submit to start the deployment.

Next we are presented with the installation process. We can follow it along, in my environment the full deployment took about 1.5 hrs

After the install is complete we are presented to links for the different services

Next i would recommend LCM certificate management found here

Upgrading vRNI (vRealize Network Insight) to 6.4.0 via vRSLCM

In this post i will go over upgrading my 6.x vRNI appliance to 6.4.0 using vRSLCM (vRealize Suite Lifecycle Manager). As a pre requirement we do need to have vRSLCM (vRealize Lifecycle Manager) upgraded to 8.6. Instructions can be found here. The upgrade already includes the latest Product Support Pack so an update to the Product Support Pack is not required.

To get started we can go to vRealize Lifecycle Manager -> Lifecycle Operations -> Settings -> Binary Mapping. (If you haven’t added your My VMware credentials you will need to do that first by going to vRealize Lifecycle Manager -> Lifecycle Operations -> Settings -> My VMware)

Click on Add Binaries under Product Binaries

Select My VMware and click on Discover

We can see a list of binaries that have been discovered. Make sure we select the upgrade package not the install package. We can select what we need and click on Add

This will create a request and start downloading the package. To view the progress we can click on the Click Here hyperlink

Click on the in Progress button to view the details

We now have to wait for the download to complete

After the download is complete we can go to Environments -> View Details on the environment that includes vRLI

Click on Upgrade

An Inventory sync is recommended if the environment has changed since LCM performed the last sync. We trigger the sync from the UI or click on Proceed to continue

Select product Version 6.4.0 and click Next. We can also review the compatibility matrix to make sure the environment is compatible.

A new feature that was added was the capability to automatically create a snapshot prior to the upgrade and remove it after the upgrade. On this screen we also have the ability to chose if we want to keep the snapshots post upgrade for validation testing for example. Click next

Run the Precheck to make sure there are no errors or issues.

Once the check is complete we can review the checks that were performed and we can continue by clicking Next.

Review the upgrade details and click on Next. We are taken to the progress screen where we can follow the progress.

The system will get rebooted and once its back up we will be on 6.4

Since we are doing a major upgrade i strongly recommend to clean the cache before using the new vRNI version.

Upgrading vIDM (VMware Identity Manager ) to 3.3.5 via vRSLCM

In this post i will go over upgrading my 3.3.3 vIDM appliance to 3.3.5 using vRSLCM (vRealize Suite Lifecycle Manager). If you want to upgrade to LCM 8.6 instructions can be found here. The upgrade already includes the latest Product Support Pack so an update to the Product Support Pack is not required.

To get started we can go to vRealize Lifecycle Manager -> Lifecycle Operations -> Settings -> Binary Mapping. (If you haven’t added your My VMware credentials you will need to do that first by going to vRealize Lifecycle Manager -> Lifecycle Operations -> Settings -> My VMware)

Click on Add Binaries under Product Binaries

Select My VMware and click on Discover

We can see a list of binaries that have been discovered. Make sure we select the upgrade package not the install package. We can select what we need and click on Add

This will create a request and start downloading the package. To view the progress we can click on the Click Here hyperlink

Click on the in Progress button to view the details

We now have to wait for the download to complete

After the download is complete we can go to Environments -> View Details on the environment that includes vIDM

Click on Upgrade

An Inventory sync is required when performing vIDM upgrades. We trigger the sync from the UI and click on Proceed once completed to continue

Select product Version 3.3.5 and click Next. We can also review the compatibility matrix to make sure the environment is compatible.

A new feature that was added was the capability to automatically create a snapshot prior to the upgrade and remove it after the upgrade. On this screen we also have the ability to chose if we want to keep the snapshots post upgrade for validation testing for example. Click next

Run the Precheck to make sure there are no errors or issues.

There`s a list of Manual Validations. Once verified click on I took care of the manual steps above and am ready to proceed check box and click on Run Precheck

Once the check is complete we can review the checks that were performed and we can continue by clicking Next.

Review the upgrade details and click on Next. We are taken to the progress screen where we can follow the progress.

The system will get rebooted and once its back up we will be on 3.3.5

Since we are doing a major upgrade i strongly recommend to clean the cache before using the new vIDM version.

Upgrading vRLI (vRealize Log Insight) to 8.6 via vRSLCM

In this post i will go over upgrading my 8.x vRLI appliance to 8.6 using vRSLCM (vRealize Suite Lifecycle Manager). As a pre requirement we do need to have vRSLCM (vRealize Lifecycle Manager) upgraded to 8.6. Instructions can be found here. The upgrade already includes the latest Product Support Pack so an update to the Product Support Pack is not required.

To get started we can go to vRealize Lifecycle Manager -> Lifecycle Operations -> Settings -> Binary Mapping. (If you haven’t added your My VMware credentials you will need to do that first by going to vRealize Lifecycle Manager -> Lifecycle Operations -> Settings -> My VMware)

Click on Add Binaries under Product Binaries

Select My VMware and click on Discover

We can see a list of binaries that have been discovered. Make sure we select the upgrade package not the install package. We can select what we need and click on Add

This will create a request and start downloading the package. To view the progress we can click on the Click Here hyperlink

Click on the in Progress button to view the details

We now have to wait for the download to complete

After the download is complete we can go to Environments -> View Details on the environment that includes vRLI

Click on Upgrade

An Inventory sync is recommended if the environment has changed since LCM performed the last sync. We trigger the sync from the UI or click on Proceed to continue

Select product Version 8.6.0 and click Next. We can also review the compatibility matrix to make sure the environment is compatible.

A new feature that was added was the capability to automatically create a snapshot prior to the upgrade and remove it after the upgrade. On this screen we also have the ability to chose if we want to keep the snapshots post upgrade for validation testing for example. Click next

Run the Precheck to make sure there are no errors or issues.

Once the check is complete we can review the checks that were performed and we can continue by clicking Next.

Review the upgrade details and click on Next. We are taken to the progress screen where we can follow the progress.

The system will get rebooted and once its back up we will be on 8.6

Since we are doing a major upgrade i strongly recommend to clean the cache before using the new vRLI version.

Upgrading vROPS (vRealize Operations Manager) to 8.6 via vRSLCM

In this post i will go over upgrading my 8.x vROPS appliance to 8.6 using vRSLCM (vRealize Suite Lifecycle Manager). As a pre requirement we do need to have vRSLCM (vRealize Lifecycle Manager) upgraded to 8.6. Instructions can be found here. The upgrade already includes the latest Product Support Pack so an update to the Product Support Pack is not required.

To get started we can go to vRealize Lifecycle Manager -> Lifecycle Operations -> Settings -> Binary Mapping. (If you haven’t added your My VMware credentials you will need to do that first by going to vRealize Lifecycle Manager -> Lifecycle Operations -> Settings -> My VMware)

Click on Add Binaries under Product Binaries

Select My VMware and click on Discover

We can see a list of binaries that have been discovered. Make sure we select the upgrade package not the install package. We can select what we need and click on Add

This will create a request and start downloading the package. To view the progress we can click on the Click Here hyperlink

Click on the in Progress button to view the details

We now have to wait for the download to complete

After the download is complete we can go to Environments -> View Details on the environment that includes vROPS

Click on Upgrade

An Inventory sync is recommended if the environment has changed since LCM performed the last sync. We trigger the sync from the UI or click on Proceed to continue

Select product Version 8.6.0 and click Next. We can also review the compatibility matrix to make sure the environment is compatible.

Run the Upgrade Assessment tool to make sure the currently used dashboards, reports, metrics etc are still compatible with the new version

Once the report has finished running we can either Download or view the report. Once everything has been reviewing we can click on the I have viewed the report and agree to proceed box and click next to proceed to the next step.

A new feature that was added was the capability to automatically create a snapshot prior to the upgrade and remove it after the upgrade. On this screen we also have the ability to chose if we want to keep the snapshots post upgrade for validation testing for example. Click next

Run the Precheck to make sure there are no errors or issues.

Once the check is complete we can review the checks that were performed and we can continue by clicking Next.

Review the upgrade details and click on Next. We are taken to the progress screen where we can follow the progress.

The system will get rebooted and once its back up we will be on 8.6

Since we are doing a major upgrade i strongly recommend to clean the cache before using the new vROPS version.

Upgrading vRA (vRealize Automation) to 8.6

In this post i will go over upgrading my 8.x vRA appliance to 8.6. As a pre requirement we do need to have vRSLCM (vRealize Lifecycle Manager) upgraded to 8.6. Instructions can be found here. The upgrade already includes the latest Product Support Pack so an update to the Product Support Pack is not required.

To get started we can go to vRealize Lifecycle Manager -> Lifecycle Operations -> Settings -> Binary Mapping. (If you haven’t added your My VMware credentials you will need to do that first by going to vRealize Lifecycle Manager -> Lifecycle Operations -> Settings -> My VMware)

Click on Add Binaries under Product Binaries

Select My VMware and click on Discover

We can see a list of binaries that have been discovered. We can select what we need and click on Add

This will create a request and start downloading the package. To view the progress we can click on the Click Here hyperlink

Click on the in Progress button to view the details

We now have to wait for the download to complete

After the download is complete we can go to Environments -> View Details on the environment that includes vRA

Click on Upgrade

An Inventory sync is recommended if the environment has changed since LCM performed the last sync. We trigger the sync from the UI or click on Proceed to continue

Select product Version 8.6.0 and click Next. We can also review the compatibility matrix to make sure the environment is compatible.

Anew feature that was added was the capability to automatically create a snapshot prior to the upgrade and remove it after the upgrade. On this screen we also have the ability to chose if we want to keep the snapshots post upgrade for validation testing for example. Click next

Run the Precheck to make sure there are no errors

The next screen remind us of hardware requirements for vRA and vIDM which can be checked here for vRA and vIDM which can be checked here. As far as i can tell they haven’t changed since the 8.3 release. Check the I took care of the manual steps above and am ready to proceed check mark and click on Run Precheck

Once the check is complete we can review the checks that were performed and we can continue by clicking Next.

Review the upgrade details and click on Next. We are taken to the progress screen where we can follow the progress.

The system will get rebooted and once its back up we will be on 8.6

Since we are doing a major upgrade i strongly recommend to clean the cache before using the new vRA version.

Skip-Level Upgrading VCF 4.1.0.1 to 4.3.1.0 Step by Step

With the release of of VCF 4.3.1 i wanted to get my lab upgraded. The release blog can be found here and the release notes are here

In order to get to 4.3.1.0 in the past we had to upgrade to each version incrementally. As per the documentation found here we can now upgrade from any release past 4.1.0.1 directly to 4.3.1 skipping the releases in between. We can do so by going to Repository -> Bundle management -> Download now. Download the Configuration drift bundle as well as the Update package.

The next step is to upgrade VCF by going to Inventory -> Workload Domains -> Select the workload domain -> Update/Patches -> Update Now for the VMware Cloud Foundation Update 4.3.1.0.

Next we are taken to the Upgrade page where we can follow the upgrade for each one of the components

Once the upgrade is complete we can click Finish to be returned back to the main screen

Because we are changing the SDDC-Manager versions i would strongly recommend to clear cache and log back in before going forward.

Next step is to upgrade NSX-T installation to NSX-T 3.1.3.1. The release notes can be found here. We can go to inventory -> Workload Domains -> Select the workload domain -> Update/Patches -> Under Available updates click on the drop down and select Cloud Foundation 4.3.1.0 -> Download now.

Once the download is complete we can proceed with updating the NSX component by clicking on the update now

The upgrade will go thought upgrading the NSX managers as well as the edges. We can view the upgrade status by clicking on view status

Once the upgrade is complete we can proceed with the vCenter Upgrade. VCF 4.3.1.0 comes with vCenter Server 7.0 Updated 2d. The release notes can be found here. We can go to inventory -> Workload Domains -> Select the workload domain -> Update/Patches -> Under Available updates click on the drop down and select Cloud Foundation 4.3.1.0 -> Download now.

Once the download is complete we can click on Update now

We can follow the status of the upgrade by clicking on the view status tab

Here we can see the different components that are getting upgraded

Once the upgrade is complete we are taken back to the previous page where we can see that the ESXi servers are next. The release notes can be found here. Click on Download Now

Once the download is complete we can click on Update now

If we have multiple clusters we can enable Cluster-level selection and select the specific cluster(s) we want to upgrade.

We can also enable sequential cluster upgrade as well as quick boot

We get to review the options once again before we click finish to to submit the task

Once submitted we can view the status by clicking on View Status

And with that we are finished with the workload domain. We can get back to the Update/Patches page

Upgrading vRSLCM (vRealize Lifecycle Manager) to 8.6

In this guide i will go over the steps of getting an existing 8.x vRSLCM appliance upgraded to the latest 8.6 release. The release notes can be found here

The first step is to lo in to vRealize Suite Lifecycle Manager under the Lifecycle Operations section

Go to settings -> System Upgrade

Click on Check for Upgrade

We can see that the check found a new version available for 8.6.0.20

Click on Upgrade

Verify that a snapshot or backup exists in case the process fails. Check the check mark for I took a snapshot of the vRealize Suite Lifecycle Manager before I performed this operation. Click Submit

This will fire up the upgrade process and start upgrading packages. The system will automatically reboot on 8.6.0.20 once completed. We can check the version by going to Settings -> System Details

If you get the below error clear the browser cache and try again

vRealize Lifecycle Manager (vRSLCM) enable product and licensing downloads

In order to enable product and licensing downloads in lifecycle manager we need to go to Lifecycle Operations

Settings -> My vmware

Add my vmware account. Make sure the account added has a proper entitlement to perform downloads and patches.

With the releases of 8.x and above we now have a password vault that we need to add the passwords to. When presented with the add my VMware Account Detail screen press on Click here to add a new password

Type in the details for your password and press add

Click on Select Credential and add the new password you created, add the username, click validate and then add

After the process is complete the product will automatically start downloading the licensing information from the my vmware portal and it will also allow us to download binaries from the add binaries page

Upgrading vRA (vRealize Automation) to 8.5

In this post i will go over upgrading my 8.x vRA appliance to 8.5. As a pre requirement we do need to have vRSLCM (vRealize Lifecycle Manager) upgraded to 8.4.1. Instructions can be found here. You will also need to apply the latest Product Support Pack (version 8.4.1.4). The instructions can be found here.

To get started we can go to vRealize Lifecycle Manager -> Lifecycle Operations -> Settings -> Binary Mapping. (If you havent added your My VMware credentials you will need to do that first by going to vRealize Lifecycle Manager -> Lifecycle Operations -> Settings -> My VMware)

Click on Add Binaries under Product Binaries

Select My VMware and click on Discover

We can see a list of binaries that have been discovered. We can select what we need and click on Add

This will create a request and start downloading the package. To view the progress we can click on the Click Here hyperlink

Click on the in Progress button to view the details

We now have to wait for the download to complete

After the download is complete we can go to Environments -> View Details on the environment that includes vRA

Click on Upgrade

An Inventory sync is recommended if the environment has changed since LCM performed the last sync. We trigger the sync from the UI or click on Proceed to continue

Select product Version 8.4.0 and click Next. We can also review the compatibility matrix to make sure the environment is compatible.

Since we already checked the sizing while the download was occurring we can check the check box for I took care of the manual steps above and am ready to proceed and click on run precheck

Run the Precheck to make sure there are no errors

Once the check is complete, click on Next. Review the upgrade details and click on Next. We are taken to the progress screen where we can follow the progress.

The system will get rebooted and once its back up we will be on 8.5